EasyManua.ls Logo

Wildfire WF9000 - Step 5: Cable Routing and Connection

Wildfire WF9000
30 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Four Post Parking Lift WF9000&WF9000XLT
Step 5: RUNNING AND ATTACHING CABLES
With the runways secured, install the 4 top caps. The top cap with the threaded holes will
be placed in the corner that will house the motor. This is the runway and corner where
the hose connects to the runway. The other threaded top cap will go kitty corner. The
other two caps will go in the remaining two posts. The holes for connecting cables will
face inward towards the runways.
The cables are all pre-assembled under the runway with the ram. They are secured in
place with cable ties. Cut the cable ties to release the cables. ** Use caution to avoid
cutting the hydraulic hose. Run the cables to their respective corners, feeding the
cables through the slot in runways. The cables are specific to each corner. See Cable
reference guide on page 26.

Related product manuals