EasyManua.ls Logo

Wildfire WF9000 - Step 6: Safety Linkage Installation

Wildfire WF9000
30 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Four Post Parking Lift WF9000&WF9000XLT
Run the cable end up through the post cap. You may need assistance to extend the ram
by pushing the ram at the same time as pulling on the cable, this would only be
necessary with the first cable. Once the threaded end is fed through the post cap, use
the washer and two nuts to lock the cable in place. Leave roughly 1 inch of thread
sticking out the top. This will allow you adjustability both up and down on the threads.
Repeat this process on all four posts.
HOW TO: Adjust Cables can be found later in this guide in the operation portion.
Step 6: INSTALLING SAFETY LINKAGE
Insert safety linkage ends into holes at the end of the runways. The safety linkage with
the handle will mount on the corner where the pump/motor assembly will be mounted
(end of runway with hose connection). In order to insert the safety linkage, you will need
to remove the nut. Leave the spacer attached as you slide safety linkage in. Once the
safety linkage has been inserted through the hole reattach the nut and thread all the way
to the end of threads.

Related product manuals