EasyManua.ls Logo

Wilo Star-Z NOVA T - Page 17

Wilo Star-Z NOVA T
49 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation
18 WILO SE 05/2021
English
5.3 Filling and venting
1. Fill the system.
2. The pump rotor space vents automatically
after a short time in operation. This may cause
noise. If necessary, switch off and on repeat-
edly to speed-up the venting process. Dry
running for short periods will not harm the
pump.
Image 5
Open the Wilo-Connector as follows:

Related product manuals