EasyManua.ls Logo

WOERNER PMF - Operation: Transport, Installation, and Start-up; Pump Unit Installation Requirements

Default Icon
37 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operating manual PMF/GMF Page 25 of 37 B0343
6. Transport, installation, start-up and putting out of operation
6.1 Transport
Transport the pump unit cautiously to its destination. For that purpose, make use of proper
equipment (for example, handcart, or the like).
6.2 Unpacking
Lift the pump unit carefully from the packaging and place that unit on a stable as well as
plane support.
Note! Consider that inside the pump unit and components attached
according to the bill of delivery, there might be residues of blue-
coloured test oil.
6.3 Installation
The pump unit is prepared for being mounted on floor by means of four screws M8. The
mounting area has to be that stable to be able absorbing the weight of the pump unit in-
cluding the filled reservoir. In addition, make sure that the mounting surface is plane.
As for the installation the pump unit take necessary prevent measures to protect the unit
from unintentional shocks.
Drilling pattern:

Table of Contents

Related product manuals