Please note before commissioning
The heating system must be completely lled with water. If necessary top up with
water.Whenllingtheheatingsystem,theshut-offvalvesmustbeopen.Thesystem
pressuremustbe1.5to2.5bar.Theconnectionbetweenthetapwaterandheating
waterrequiredforllingmustberemovedafterthellhasbeencompleted.Otherwise
thereisariskthatyourtapwaterwillbecontaminatedbyheatingwater.
The system may overheat if the boiler is operated without water.
Inhibitors are not permissible. Otherwise there is a risk of damage to
the boiler.
Filling the system
Note
Theshut-offvalvesforheatingowandheatingreturnmustbeopen.
Opening the shut-off
equipment
Regularly check the system pressure. The pressure gauge must indicate between
1.5and2.5bar.Your heatingcontractorwillexplainhowto top upyoursystem.Do
not supplement your heating water with additives, otherwise components may be
damaged.
Checking the heating
water
Shut-off valves
(accessory)
Fill and drain connection
Heating return
(incl.llanddrain
connection)
Heating ow
(incl.llanddrain
connection)
Gas ball valve
Open:Pushandturnanti-clockwise
Close:Turnclockwise
Maintenance valve
Heating return
Close
Open
Maintenance valve
Heatingow
Close
Open