EasyManua.ls Logo

Wolf TGB-40 - Page 15

Wolf TGB-40
20 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
.Removecombustionresidueswith aplastic brush
(non-metallic brush).
.Washseverelycontaminated burnersin a soapy
solution and rinsewith tap water.
.Cleanseverelycontaminated heatingwater heat
exchangerswith Fauch600,Fauch610,Sotin230
(230 GA)or equivalentcleaningagentsand rinse
with tap water.
. Reassemblein the reverseorder.
Generally,replaceall gasketsonwater andflue
gascomponentswhichhavebeenseparatedand
coatwith silicongrease(othergreasewill destroy
the gaskets)prior to reassembly.
. During reassembly,checkfor correct positioning
of the combustionchamberunit in relation to the
condensatesump.
. During reassembly,checkfor correct position of
the control cables.
Safety instructions
Carryout the following stepsafter completing the
abovemaintenancesteps:
. Openthe shut-off valve at the heatingflow
and return. Openthe cold water inlet.
. Topup the heating system,if required,to
approximately 1.5bar,andvent the heating
system.
. Openthe gasshut-off valve.
. Switch on the emergencystop switch (if
installed).
. Switch on the ON/OFFswitch on the Wolf gas-
fired boiler.
. Checkthe boiler water and gasconnectionsfor
leaks.
. Checkthe boilerfor perfectfunction andflue gas
values.
. Hookin the front casing.
Maintenance
Heating water heatexchangercomplete with the
combustion chambercylinder
I
Fig.: Heating water heatexchanger
Combustion chamber unit
Condensatesump
Fig.: Position of the combustion chamberunit/condensate
sump
Fig.: Control cableposition
33
cfi
~~

Other manuals for Wolf TGB-40

Related product manuals