SETUP & OPERATION
Planer/thicknesser setup
EGdoc072921 3-1
3
SECTION 3 SETUP & OPERATION
3.1 Planer/thicknesser setup
IMPORTANT! Before starting to use the planer/thicknesser you have
to meet the following conditions:
Set up the planer/thicknesser on firm, level ground and level the planer/thicknesser. Secure
the planer/thicknesser to the ground to prevent moving during operation. A cement pad with
8-10 mm diameter anchor bolts is recommended.
Indoors the planer/thicknesser can be operated with the sawdust collection system only.
The planer/thicknesser can not be operated when it is raining/snowing and in case of rain or
snow the sawmill must be stored under roof or indoors.
The planer/thicknesser can be operated in temperature range from -15
o
C to 40
o
C only.
The illumination at the operator's position should be at least 300lx
1
.
The planer/thicknesser’s operator position and E-Stop safety buttons location are shown
below.
See table 3-1. Have a qualified electrician install the power supply (according to EN 60204
Standard). The power supply must meet the specifications given below.
1. Light source can not cause stroboscopic effect.
3-Phase
Volts
Fused Disconnect
Switch
Suggested Wire Size
400 VAC 14 A
1.5 mm
2
up to 15 m long
TABLE 3-1
!