EasyManua.ls Logo

Xantrex GT100E - Page 34

Xantrex GT100E
40 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Configuration
3–4 152602
3. Click Send Configuration
4. Verify that the Present Inverter Data has the unit set as the Configured
Slave unit.
Refer to the GUI Help menu for complete configuration instructions.
Important:
If the inverter's date (not the workstation's!) is odd then the
Inverter is OPERATIONAL SLAVE until midnight; if the date is even, the
Inverter is OPERATIONAL MASTER until midnight.
CAUTION
The Master/Slave configuration will only be activated after power is cycled on
the unit.
Important:
Verify that the date is the same on both the GT100E #1 and
GT100E #2. This will allow the daily role reversal option to function correctly.

Related product manuals