EasyManua.ls Logo

Xinje DS2-20P7-BSW - Reference Origin Diagrams and Definition

Xinje DS2-20P7-BSW
99 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
48
Detailed explanation:
Find reference origin diagram:
The timing diagram of finding reference origin of forward side:
Steps:
1. Install limit switch at forward and reverse side. At the rising edge of /SPD-A, motor
runs forward at the speed of P2-95 to find the reference origin of forward side.
2. After the working table hit the limit switch, the motor stop as the mode set by parameter
P0-06.H.
3. Motor leaves the limit switch at the speed of P2-96. After the working table left the
limit switch, the motor run at the Z phase signal position of No.n optical encoder. This
position is considered as the coordinates origin, n is decided by parameter P2-94.
(2) Define the reference origin
/SPD-A
/P-OT
/Z
V
t
P2-96
P2-95
P2-94
Parameter
Signal
Default
Meaning
Modify
P5-17
/SPD-D
n.0000
Mode 1,2,3,4: not distribute
to the terminal. To switch
the rotation direction.
Range: 0000-0015.
Distribute to input
terminal through
P5-17. When it set to
0001, it means input
signal from SI1.
Mode 5,6: not distribute to
the terminal. To define the
current point to origin.
/P-OT
/N-OT
Speed P2-95
Direction CW
Stop mode
P0-06.H
Speed P2-96
Direction CCW
P2-94
Speed P2-95
Direction CCW
Stop mode
P0-06.H
Speed P2-96
Direction CW
P2-94
Reference origin
of forward side
Reference origin
of reverse side
Z signal quantity
Z signal quantity

Table of Contents

Related product manuals