EasyManua.ls Logo

XtremepowerUS 75117 - Operation; Prior to Start-Up; Priming the Pump

XtremepowerUS 75117
22 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
11
OPERATION
OPERATION
PRIOR TO START-UP
PRIMING THE PUMP
Step 1: Inspect Connections
• Check all hose and pipe connections to ensure they are tight and secure.
Step 2: Check O-Rings
• Make sure the O-rings on the strainer basket lid and other connections are in good condition and
properly seated.
Step 3: Ensure Valve Positions
• Verify that all valves are in the correct positions for normal operation.
Step 4: Verify Electrical Connections
• Ensure that the pump is properly plugged in or wired to the electrical supply.
Step 1: Fill the Strainer Basket
• Open the strainer basket lid and fill the basket with water until it is full.
Step 2: Secure the Lid
• Close and securely fasten the strainer basket lid to ensure a good seal.
Step 3: Open the Air Release Valve
• Open the air release valve on the pool filter to allow air to escape during priming.
Step 4: Turn On the Pump
• Turn on the power to the pump. The pump should begin to draw water and expel air from the
system.
Step 5: Monitor for Proper Operation
• Observe the pump to ensure it is pulling water efficiently. You should see a steady stream of
water flowing through the system.
Step 6: Close the Air Release Valve
• Once water is flowing steadily and all air has been expelled, close the air release valve.
Step 7: Check for Leaks
• Inspect all connections and fittings for any signs of leaks. Tighten as necessary.