EasyManua.ls Logo

YASKAWA SGM7M - Page 44

YASKAWA SGM7M
55 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4.2 Inspection and Checking before Trial Operation
4-5
4
Trial Operation (Checking Servomotor Operation)
Checking the Main Circuit Power Supply, Servomotor, and Encoder
Wiring
Once again, check the main circuit power supply, servomotor, and encoder wiring
that was described in Chapter 3 Wiring and Connection.
Note: Do not connect the I/O signal cable to the CN1 connector in trial operations.
Encoder cable
Power supply
Main circuit cable
for servomotor

Other manuals for YASKAWA SGM7M

Related product manuals