22
Table of Contents
Page
1 - Specifications......................................................................................................................................................................3
1.1 - Product range......................................................................................................................................................3
• ARTTP001S (SMS-1)....................................................................................................................................3
• ARTTP002S (SHP-2) ....................................................................................................................................3
1.2 - Technical data.....................................................................................................................................................3
1.3 - Introduction ..........................................................................................................................................................3
1.4 - Standard features ...............................................................................................................................................3
1.5 - Temperature accuracy.......................................................................................................................................3
2 - Installation............................................................................................................................................................................3
2.1 - Introduction ..........................................................................................................................................................3
• Progressive recovery .......................................................................................................................................3
• Thermostat and sensor calibration ................................................................................................................3
2.2 - Dimensions ..........................................................................................................................................................3
2.3 - Location................................................................................................................................................................3
2.4 - Installation and wiring ........................................................................................................................................4
2.5 - Fixing the thermostat and cover to the installed base ................................................................................4
2.6 - Dip Switch settings for ARTTP001S (SMS-1) ..............................................................................................4
2.7 - Dip Switch settings for ARTTP002S (SHP-2) ...............................................................................................5
3 - Wiring......................................................................................................................................................................................5
3.1 - Thermostat ARTTP001S (SMS-1) terminals..................................................................................................5
3.2 - Thermostat ARTTP002S (SHP-2) terminals ..................................................................................................5
3.3 - Connections between thermostat and equipment ARTTP001S (SMS-1) ................................................6
3.4 - Connections between thermostat and equipment ARTTP002S (SHP-2) ................................................6
4 - Operating the thermostat..............................................................................................................................................7
4.1 - Keypad layout .....................................................................................................................................................7
4.2 - Description of icons............................................................................................................................................7
4.3 - Power failures .....................................................................................................................................................7
5 - Programming the thermostat......................................................................................................................................8
5.1 - Understanding 7 Day programming ................................................................................................................8
5.2 - Setting the current day and time......................................................................................................................8
6 - Remote sensors .............................................................................................................................................................12
- Single sensor installation .......................................................................................................................................12
- Multiple sensor installation ....................................................................................................................................12
- Duct sensor installation ..........................................................................................................................................12
- Troubleshooting.......................................................................................................................................................12
- Sensor wiring ...........................................................................................................................................................13
- Outdoor sensor installation....................................................................................................................................14
- Outdoor sensor wiring ............................................................................................................................................15