EasyManua.ls Logo

York HA090 - Page 36

York HA090
222 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
036-21371-001-B-0203
12 Unitary Products Group
CLEARANCES
CENTER OF GRAVITY
Overhead (Top)
1
1
Unit must be installed outdoors. Overhanging structures
or shrubs should not obstruct air discharge outlet.
120”
Front
(Piping and Access Panels
30”
Left Side 24”
Right Side 24”
Rear 24”
Bottom
2
2
Adequate snow clearance must be provided if winter
operation is expected.
0”
Unit
Dim. (inches.)
ABCD
EA090 70-1/8 32 29-5/8 16-1/2
FIGURE 4: UNIT DIMENSIONS & CLEARANCES - OUTDOOR UNITS
AIR
OUT
AIR
IN
AIR
OUT
2-3/4
32
2-1/4
32-1/2
70-1/8
8-3/4
5-3/8
CONTROL BOX
ACCESS
GUAGE
LINE
ACCESS
39
1-3/8* OD
VAPOR LINE
5/8* OD
LIQUID LINE
14-3/4
7/8 DIA
CONTROL WIRING
ENTRY
COMPRESSOR AND
CONDENSER FAN MOTOR
ACCESS
1-3/8 DIA.
POWER WIRING
ENTRY
6-3/4
CONDENSER FAN MOTOR
ACCESS
7/8" KNOCKOUT
ACCESSORY WIRING
ENTRY
6-3/4
5-7/8
*AIR ON 3 SIDES
EA090
(7-1/2 Ton)
All dimensions are in inches. They are
subject to change without notice. Certified
dimensions will be provided upon request.
http://www.rezine.ne
t
Page 36

Related product manuals