EasyManua.ls Logo

York HIC4008B21S - Page 24

York HIC4008B21S
46 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
20
P5417054
6. Insulate the condensate pipe connection and the condensate hose after connecting them. If improperly
insulated, condensation will occur.
7. Insulate the condensate piping with insulation wrap as it runs through the indoor unit.
Drain-up Mechanism
PCB
Terminal
Blocks
Service Connector
(Marked with Green)
R
S
L
A
B
1
2
Insulation (3/16T x 1 x 19-11/16)
(Accessory)
Completely wrap up the transparent area
of the condensate pipe end connection.
Insulation (3/16T x 3-15/16 x 7-7/8)
(Accessory)
Wrap up the condensate hose completely
to cover the hose clamp.
Hose Clamp (Accessory)
Unit: inch
Moisture which has discharged into the condensate pan and check for drainage in the heating season
should be drained completely from the condensate pan.
The heat exchanger is heated since a slight amount of refrigerant circulates inside the indoor unit during
periods of stoppage. As a result, moisture in the condensate pan evaporates, causing condensation
issues.
After the condensate check is completed, reinsert the rubber plug and seal the gap with a silicon sealant.
Simplied Operation of Drain-up Mechanism
The following is the simplied operation procedure of the drain-up mechanism.
Turn OFF the power supply.
Disconnect the service connector (marked with green).
Turn ON the power supply and start the simplied operation of the drain-up mechanism.
Turn OFF the power supply.
Reconnect the service connector.
NOTE:
Make sure to hold the connector part. Do not remove and plug in the connector frequently (more than two
or three times).
Turn off electrical power at the power supply when handling the service connector. An electrical
shock hazard exists.
NOTICE

Other manuals for York HIC4008B21S

Related product manuals