Do you have a question about the YTL YARD COMMANDER and is the answer not in the manual?
Steps to attach the frame to the hopper using screws and connect the impeller.
Instructions for inserting the spindle, attaching wheel frames, and securing frame braces.
Details on inserting axle bushings, attaching wheels, and securing with end caps.
Steps to attach the handle shaft, pivot bracket, and upper handles with controls.
Instructions for connecting the control rods to the handle and shut-off plate.
Adjusting the control lever, inserting the R pin, and placing the screen.
Estimating material, setting flow control, and calibrating for application rate.
Detailed list of components with reference numbers, drawing numbers, descriptions, and quantities.