EasyManua.ls Logo

Zenair CH2000 - Page 25

Default Icon
78 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
TABLE 1 ZENAIR INSPECTION FORM
Make / Model
ZENAIR CH2000
Serial No.
Airframe Hours
Type of Inspection
(Circle One)
Registration No:
Engine Hours
50 100 500 1000
Symbols: + Indicates perform task, - Indicates do not perform task
Task
Refer to
Intervals
(Flight Hours)
Initials
50
100
500
1000
12. Perform operational check of the pitot
static heater (if installed).
13. Perform operational check of fuel
quantity indicating system.
Fuselage Group
1. Inspect the outer fuselage skin for
cracks, corrosion, loose rivets,
damage, etc.
2. Inspect fuselage bulkheads, stiffeners
and internal structure for cracks,
corrosion, damaged fasteners, etc.
3. Inspect flight control cables for routing,
fraying, corrosion and tension.
4. Inspect flight control turnbuckles,
pulleys and guides for wear, damage
and safeties.
5. Check flight control torque tube
bearings for wear.
6. Inspect electrical wiring for condition,
security, routing, damage, etc.
7. Inspect fuel lines for security, damage,
and leaks.
8. Inspect the battery for condition, fluid
level and clean terminals. Inspect the
battery box. Not required with SEALED
LEAD ACID battery
9. Drain water from fuselage fuel tank
using sump drain (if applicable).
Check sump drain for leaks. Clean
gascolator fuel filter.
10. Check fuel tank filler cap (if installed)
for security, condition, etc.
Empennage Group
1. Inspect the vertical stabilizer, rudder,
stabilator and trim tab skins for cracks,
loose fasteners, damage, etc.
Section IX
Section VII
Section II
-
-
+
-
-
-
-
-
-
-
+
+
-
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
Nov-02 3-9

Table of Contents

Related product manuals