General Operation
4.15
10.Subtract the second measurement (M2) from the first
measurement (M1).
Example:
The total sag is 1.97 in (50 mm). Refer to the chart below
for the correct sag. If the sag is not correct, the spring
preload should be adjusted.
Measurement Operator Value
M1 23.62 in (600 mm)
M2 - 21.65 in (550 mm)
Sag = 1.97 in (50 mm)
MODEL SAG
S & SR 1.77 in (45 mm)
DS & DSR 2.36 in (60 mm)
Zero Owner's Manual (S and DS).book Page 15 Wednesday, February 28, 2018 11:21 AM