EasyManua.ls Logo

Zip 5253UK - Page 18

Zip 5253UK
29 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
18
Installation instructions
805845UK V1.02 July 2018 - G4 Command Centre
Technical support
Tel: 0345 6 005 005 Email: service@zipindustries.co.uk www.zipwater.co.uk
1.5.2 Preferred ventilation arrangements for CS models
The ducted vent kit supplied with the Command Centre exhausting through the kick-space should be used, to
provide adequate ventilation in all conditions. (Ancillary components are not shown in these diagrams).
1.5.1 Ventilation for all models
The clearance envelope dimensions stated in the specification sheets and installation instructions must
be observed.
Adequate ventilation must be provided to ensure that the cupboard space temperature does not exceed
35
0
C.
B
A
C
100mm min.
Cupboard back must be fully
closed to prevent recirculation
into cupboard from kick space.
A
1.5 CS & C Commercial Command Centres
Ventilation
Vent cut-out details
A Air outlet vent
(flat vent)
B Air inlet vent
314
Ø
12 x 2
326
5
43max
285
60
Ø
12 X 4
=
=
45
284
Ø
12 x 4
C Ducted vent

Related product manuals