EasyManua.ls Logo

Zip Hydroboil 303552 - Installation Instructions; Before You Begin; Step 1 - Position the Hydroboil; Step 2 - Fasten to the wall

Zip Hydroboil 303552
20 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
06
Installation instructions & user manual
804545UK V2.03 Aug 2018 - Zip Hydroboil
Technical support
Tel: 0345 6 005 005 Email: service@zipindustries.co.uk www.zipwater.co.uk
Installation instructions
Before You Begin
Locate the paper mounting-hole template packed with the Hydroboil. (Also see
pages 13, 14).
Read the installation and operating instructions completely.
Decide whether to install with concealed or exposed plumbing connections.
Concealed connections are preferred for superior appearance.
Step 1 – Positioning
Position the Hydroboil so the spout will drain onto a draining board or drip tray.
Position the base of the tap nozzle to be not less than 280mm (nominally
360mm) above the draining board (height should be increased only if essential
for filling larger vessels).
Provide clearance for service access of not less than 150mm top, 65
mm left, 20mm right.
Mark corner positions for the Hydroboil on the wall in order to position the
paper mounting-hole template.
Step 2 – Fastening
Position mounting-hole template on wall and drill holes where shown.
Drill holes for water inlet and vent outlet if rear access is intended.
Install plumbing and wiring and prepare pipe ends as shown adjacent & on
page 8.
Remove cover fastening screws from Hydroboil and lift off cover.
Screw Hydroboil chassis to the wall using screws or bolts suited to the wall,
(supplied).
Fasteners must be able to support the product weight when full, (see
Technical specification, page 5).
45mm
Elbow
Inlet clearance
Cold
inlet
Vent
outlet
Inlet
position
Vent
position
3 to 7.5 litre models
Strain relief bush (cable gland)
Terminal block
Escutcheon
Tap nut
Tap
Concealed
access

Related product manuals