EasyManua.ls Logo

Zip Hydroboil Plus 3L - Step 5 - Assembly

Zip Hydroboil Plus 3L
28 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
13807066 v1.00 03.21 HBP AB Install Instructions
Step 5 – Assembly
(Australian 3L, 5L, 7.5L
models) Refit filter guide
Push filter guide upwards.
Rotate clockwise until locked.
Refit cover. Fix with screws,
top and bottom.
Apply thread tape to thread.
Turn tap until it touches the
lock nut and is upright.
Use spanner (supplied) to
tighten the lock nut.
5.1
5.3
5.4 5.5
Refit cover
5.2
Refit tap (Autoboil models)

Related product manuals