EasyManua.ls Logo

Zip Hydroboil Plus 3L - Page 15

Zip Hydroboil Plus 3L
28 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
15807066 v1.00 03.21 HBP AB Install Instructions
Step 6 – Commissioning
Turn on electrical power
Turn the mains electrical power ON. Refer to the screen.
Touch the white circle left of the [Tick] to “Continue”.
Boiling Calibration will commence. Allow several minutes for the water to boil.
Calibrating Completed
When completed, as prompted, turn on the mains water supply.
Select to
Continue
The home screen will be shown (see section 2.1).
The tank will fill and heat. Allow 15-30 minutes for the water to reach boiling set
temperature.
6.4

Related product manuals