Quick Start Installation Guide
807042 v1.02 08.22 HydroTap G5 UltraCare Install Instructions
SECTION 13: Commissioning
13. Commissioning the HydroTap using the HydroTap Clean can
Initial commissioning screen touch
Language option.
Touch the appropriate button to select
the language and units of choice.
Touch the back arrow to go back to
previous menu.
In the previous menu, touch the arrow to
begin the commissioning process.
Optional screen shown if the
commissioning was previously started but
not complete (Command Centre powered
off during process). Otherwise screen will
not be shown.
Read the commissioning information,
touch the forward arrow to go to the next
screen.
(Touch the back arrow to go back to
previous menu).
13.2 Select the language
13.1 Turn on the supplies & familiarise yourself with the system
Connect the mains electrical power cable to the supply.
Turn the power and water on and check for any leaks.
Familiarise yourself with the operation of the tap and GUI screen in
preparation for use, see the user guide.