EasyManua.ls Logo

Zippity Baskenridge - Step 3: Install Post Caps, Hinges, and Latch

Zippity Baskenridge
13 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
WWW.ZIPPITY-OUTDOOR.COM
7
ASSEMBLY
INSTRUCTIONS
ZP19038
STEP 2.5
STEP 3.1 STEP 3.2
(K) against a gate rail
and gate post as shown. Fasten the L bracket with (4) ¾” white self-drilling
stainless steel screws. Repeat for the three remaining inside corners.
 (A) over the
gate posts. The post caps will lock into
place.
Pre-drill two holes on the face of the gate rails
for each Gate Hinge (G) (L).


Self-Drilling Stainless Steel Screws .
K
A
STEP 3:
 POST CAPS, GATE HINGES, AND GATE LATCH
G
I
L
¼”

Other manuals for Zippity Baskenridge

Related product manuals