WWW.ZIPPITY-OUTDOOR.COM
7
ASSEMBLY
INSTRUCTIONS
ZP19038
STEP 2.5
STEP 3.1 STEP 3.2
(K) against a gate rail
and gate post as shown. Fasten the L bracket with (4) ¾” white self-drilling
stainless steel screws. Repeat for the three remaining inside corners.
(A) over the
gate posts. The post caps will lock into
place.
Pre-drill two holes on the face of the gate rails
for each Gate Hinge (G) (L).
Self-Drilling Stainless Steel Screws .
K
A
STEP 3:
POST CAPS, GATE HINGES, AND GATE LATCH
G
I
L
¼”