EasyManua.ls Logo

Zte MC7010 - System Power-On; Powering On and Acceptance

Zte MC7010
32 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
18
System Power-On
Powering on the device
Connect the power connector on the POE adapter to the socket. The POE adapter
starts to supply power to the MC7010. When the indicator of the POE adapter and
the POWER LED of the device turns green, the MC7010 is correctly powered on.
Preliminary Device Acceptance
1. Check indicator status.
2. Connect the device to a PC and log in to the conguration page to view the
device status.

Related product manuals