EasyManua.ls Logo

3M SCOTT AIR-PAK X3 PRO - Page 38

3M SCOTT AIR-PAK X3 PRO
56 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
SOFT GOODS ASSEMBLY & DISASSEMBLY
38 P/N 595360-01 Rev G 202004
Figure 2-26 Securing the regulator hose
5 Attach the lower cable routing clamp to the shoulder pad webbing by folding the edges of the webbing together
to form a “V” and sliding the edges into the clamp opening. See Figure 2-27.
Figure 2-27 Attaching the lower cable routing clamp
6 Position the straps at top of the shoulder harness over the cable,
gaugeline, and regulator hose. Snap the fastener closed. See
Figure 2-28.
Figure 2-28 Securing the cables and hose
7 Snap the fastener on the drag rescue loop together and then snap the loop to the shoulder pad. See Figure 2-29.
Ensure that the cable and gaugeline are positioned on opposite sides of the snap.
NOTE
The snaps at the top of the shoulder harness are directional
snap fasteners. To snap closed, align the two sides of the
fastener and press from the end opposite the dot toward the
end with the dot until you hear a “snap.” Do not use a tool or
excessive force to engage or disengage the snaps.
Lower regulator
hose retaining
strap

Other manuals for 3M SCOTT AIR-PAK X3 PRO

Related product manuals