EasyManua.ls Logo

3ntr A2 - Planned Maintenance Schedule; Heat Exchanger and Liquid Reservoir Care; Lubrication of Rails and Screws

Default Icon
36 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Planned maintenance
Here is a list of checks you can commit to every 6-12 months to keep you machine in healthy state.
Heat exchanger and liquid reservoir
The upper left part of the printer contains the liquid cooling system.
Dusty environment may decrease the performances of the heat exchanger (aka: radiator): to avoid problems
we recommend to vacuum the air inlets (a household vacuum cleaner will do just fine) just from outside,
without the need to remove any machine cover.
The liquid reservoir should be filled up to 4-5mm from the top. To check the level, you must remove the upper
left part cover: be sure to remove the AC cable before attempting cover removal.
If needed, you can refill with a mix of radiator liquid and water (20-25% mix): be sure to tighten lid when
done.
Lubrication
All machine parts don't need any special care about lubrication, but some cleaning may improve the machine
lifespan.
Using a lint-free towel (not leaving any trace, like the ones used in good auto body paint shops) clean X,Y
and Z rails.
After cleaning, apply some oil drops on rails and Z screws, removing excess lubricant (always using lint free
towel).
34

Related product manuals