77
V3 Series Startup Form
Job Name:_____________________________________________
Address:____________________________________________________________________
____________________________________________________________________________
Model Number:_______________________________________________________________
Serial Number:___________________________________________
Startup Contractor:____________________________________________________________
Address:____________________________________________________________________
______________________________________________________
Installing contractor should verify the following items.
1. Is there any visible shipping damage?
3. Are the unit clearances adequate for service and operation?
4. Do all access doors open freely and are the handles operational?
5. Have all shipping braces been removed?
6. Have all electrical connections been tested for tightness?
7. Does the electrical service correspond to the unit nameplate?
8. On 208/230V units, has transformer tap been checked?
9. Has overcurrent protection been installed to match the unit nameplate
requirement?
10. Have all set screws on the fans been tightened?
11. Do all fans rotate freely?
12. Does the field water piping to the unit appear to be correct per design
parameters?
13. Is all copper tubing isolated so that it does not rub?
14. Have the damper assemblies been inspected?
15. Are air filters installed with proper orientation?
16. Have condensate drain and p-trap been connected?
17. Is the TXV sensing bulb in the correct location?
18. Does the TXV sensing bulb have proper thermal contact and is
properly insulated?