20 Mechanical installation – Frames R1 to R3
Free space requirements
The flange-mounted drives can be installed side by side. For free space requirements
above and below the drives, see the table.
Above
Below
Above Below
mm in mm in
R1 100 3.94 200 7.87
R2 100 3.94 200 7.87
R3 115 4.53 200 7.87