EasyManua.ls Logo

ABB ACH580-01 Series - Page 29

ABB ACH580-01 Series
84 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Mechanical installation – Frames R1 to R3 29
2. Then detach the power cable shelf (screws i). Reinstall the screws to avoid
moisture exchange through the empty holes! Attach the cable shelf to the bottom
bracket with M4 nuts. Frame R3 is shown as an example. The cable shelf varies
in different frame sizes.
2 × M4 nut
1.5 N·m
1.5 N·m
i
i

Table of Contents

Other manuals for ABB ACH580-01 Series

Related product manuals