Installation and commissioning guide
1ZSC000563-ACF EN, REV. A, 2020-06-25
Procedure
1. Loosen the M8 bolts (24).
G006900
2.
Remove the M10 bolts (6), and then remove the
outer terminal (5).
G006904
3.
Install the lifting tool (1), the M10 bolts (6) and the
washers (7).
G001935
Torque
40 ±4 Nm