EasyManua.ls Logo

ABB GOE(2) - Page 37

ABB GOE(2)
80 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation and commissioning guide
1ZSC000563-ACF EN, REV. A, 2020-06-25
37
4. Put the pull-through cord (12) through the
box-spanner (13).
G004680
5.
Apply Molykote Multilube to the thread on the
pull-through cord (12), and then connect it to the
draw rod.
NOTE!
Or use a lubricant with equal properties
to Molykote Multilube.
G006811
6.
Remove the M16 nut (10), and washer.
G006906
7.
With a soft cloth, carefully clean the bottom end of the bushing, and the inside of the center hole. Look
for damage.

Table of Contents

Related product manuals