GILLETTE ŁÓDŹ
Robotic station for packing FFS1 dispensers
Figure 49 Grapple mounting screws
Attention! Similarly, in the opposite way, install the second gripper on
the robot flange. Depending on the recipe, install the marked gripperin blue –
4s recipe thered – recipe 8s.
● Replacing lead bands
Attention! The concept of color marking tools was adopted.
Blue color – 4s recipe
Red color – Recipe 8s
Each leading band was marked with a color and number. Depending on
the recipe, the operator rearms the machine using tools marked in blue or red.
Additionally, the places where a given band should be installed are marked
accordingly. All guide bands are mounted on positioning pins, which allows for
quick retooling of the device. For the recipe8s bands 1, 2, 3 and 4 are used for
the recipe4s bandy 3, 4, 5 and 6.
ABB Sp. z o.o.
Side 93/135
DTR_GILLETTE_ZSDPD_Farmores1_IRB360_2015_v03