Figure 46: Connection of the test set to the IED for test of U1 block level
where:
1 is three-phase voltage group1 (U1)
2 is three-phase voltage group2 (U2)
3. Decrease slowly the voltage in phase UL1 of the test set until the START
signal resets.
4.
Check U1 blocking level by comparing the voltage level at reset with the set
undervoltage blocking U1Low.
5. Repeat steps
2 to 4 to check U1Low for the other phases.
The connections to U1 must be shifted to test another phase.
(UL1 to UL2, UL2 to UL3, UL3 to UL1)
Check of U2Low
SEMOD175258-91 v3
Procedure
1. Connect voltages to the IED according to valid connection diagram and
figure
47.
Section 11 1MRK 505 378-UEN A
Testing functionality by secondary injection
202 Line differential protection RED670 2.2 IEC
Commissioning manual