IEC140000143-1-en.vsd
IEC140000143 V1 EN-US
Figure 15: Stop capturing the IEEE C37.118 synchrophasor data
Open the capture file and observe the captured synchrophasor data. In order to
get the Phasor names on top of each column (See figure
16), the capture
process should start before connecting the PMU Connection T
ester to the
PMU, i.e. first start the capturing and then click Connect
.
Section 9 1MRK 505 378-UEN A
Establishing connection and verifying the IEEE C37.118/1344 communication
84 Line differential protection RED670 2.2 IEC
Commissioning manual