5.7 Testing the protection functionality
Each protection function must be tested individually by secondary injection.
• Verify operating levels (trip) and timers.
• Verify alarm and blocking signals.
• Use the disturbance handling tool in PCM600 to evaluate that the protection
function has received the correct data and responded correctly (signaling and
timing).
• Use the event viewer tool in PCM600 to check that only expected events have
occurred.
1MRK 502 049-UEN A Section 5
Testing IED operation
41
Commissioning manual