EasyManua.ls Logo

ABB REG650 - Load Encroachment LEPDIS

ABB REG650
144 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
IEC10000142-1-en.vsd
0
1
2
COMMON TRIP COMMAND (trip)
-1
0
1
TRIPZ1 (tripZone1)
0
1
2
TRIPZ2 (tripZone2)
0
1
2
START (start)
0
1
2
GENMODE (generatorMode)
0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5
-1
0
1
time in seconds
MOTMODE (motorMode)
IEC10000142 V1 EN
Figure 14: Boolean output signals for the injected current with two
components: a 50 Hz current component and a component with
49 Hz
6.4.5 Load encroachment LEPDIS
Prepare the IED for verification of settings as outlined in 5.1 "Preparing the IED to
verify settings".
Values of the logical signals for LEPDIS are available on the local HMI under Main
menu/Tests/Function status/Impedance/LEPDIS/LEPDIS:1. The Signal
Monitoring in PCM600 shows the same signals that are available on the local HMI.
Load encroachment operates on the same measuring principles as the impedance
measuring zones. Thus, it is necessary to follow the same principles as for distance
protection when performing the secondary injection tests.
Measure operating characteristics during constant current conditions. Keep the
measured current as close as possible to the rated value of its associated input
transformer or lower. Ensure, however, that it is higher than 30% of the rated current.
Section 6 1MRK 502 049-UEN A
Testing functionality
58
Commissioning manual

Table of Contents

Other manuals for ABB REG650

Related product manuals