35
100
200
50
10
20
5
1
2
3
4
30
40
123451068
I/FLA
1.05
t
6x
[s]
120
60
30
20
15
10
5
2.5
t/s
1000
500
300
400
2000
3000
4000
A070086
Fig. 5.1.4.2.-4 Trip curves at prior load 1 x FLA and p=20%
5.1.4.3. Start-up supervision
Start-up supervision can be based on either definite-time overcurrent protection or
thermal stress calculation. The selection is made in SGF3, the default being thermal
stress calculation.
Motor Protection Relay
Technical Reference Manual - ANSI Version
REM 610REM 610
1MRS755537