3. A double taskbar will show up indicating the progress of the migration.
4. Various steps during migration process is indicated in the following screen and the
migration process will take some minutes based on the configuration.
5. At the end, a dialog will confirm that the migration is completed.
1MRK 511 433-UEN B Section 8
IED configuration migration tool
SAM600 Process Bus I/O System 51
Engineering manual
© Copyright 2017 ABB. All rights reserved