EasyManua.ls Logo

ABB TPL85-B14 - Page 71

ABB TPL85-B14
134 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operation Manual / TPL85-B14/-B15/-B16
Maintenance
5
Cleaning turbine blades and nozzle ring
in operation
5.5
Page 69
© Copyright 2016 ABB. All rights reserved.
May 2016 HZTL2491_EN Revision B
Operating the integrated dry cleaning device
01
Granulate container
(51502)
07
Combined air valve / Pressure-
relief valve (51504)
02
Cover cap (51503) 08
Clamp (51515)
03
Compressed air supply [4 to 10 bar] 09
Pipe elbow (51521)
04
Hose (51512) 10
Heat protection hose (51516)
05
On-Off valve (51505) 11
Screw insert (51514)
06
Ball valve (51513) 12
Cleaning instructions (51517)
CAUTION
The air system must be protected against overpressure (> 10 bar) .

Table of Contents

Other manuals for ABB TPL85-B14

Related product manuals