EasyManua.ls Logo

ABB Vmax 12 - Packing and Transport

ABB Vmax 12
36 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
44
VMAX - INSTALLATION AND SERVICE INSTRUCTIONS
1. Packing and transport
The circuit breaker is shipped in special packing, in
the open position and with the springs discharged.
Each piece of apparatus is protected by a plastic
cover to prevent any infiltration of water during the
loading and unloading stages and to keep the dust
off during storage.

Related product manuals