EasyManua.ls Logo

ACTi E44 - Page 16

ACTi E44
35 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
www.acti.com
Installation Guide
16
b. If necessary, adjust the bracket position and then tighten the lock screw to lock
its position (torque 0.5 +/- 0.05 Nm).
NOTE: Make sure to secure the screw with the appropriate torque force (torque
= 0.5 +/- 0.05 Nm). The use of electric screwdriver or putting too much torque
force may cause damage to the bracket.
3. Mark and drill the location of the screw holes and cable hole, if necessary.
NOTE: Depending on the surface where you will install the camera, it may be necessary to
drill three (3) holes and use the supplied screw plugs.

Other manuals for ACTi E44

Related product manuals