Do you have a question about the Afore On-Grid and is the answer not in the manual?
Manual covers installation, commissioning, operation, and maintenance of Afore on-grid PV inverters.
Manual is intended for qualified personnel for performing tasks.
Illustrates the typical connection diagram for an on-grid PV system.
Lists essential safety precautions for operating and installing the inverter.
Explains the meaning of various safety symbols used in the manual.
Details the contents of the inverter package and instructions for unpacking.
Provides dimensions and visual overview of different inverter models.
Guides on selecting an appropriate and safe mounting location for the inverter.
Step-by-step instructions for mounting the inverter on a wall.
Covers the procedures for connecting PV, Grid, Earth, and communication cables.
Describes the inverter's control panel, buttons, and LED indicators.
Outlines the hierarchical menu system of the inverter for various settings.
Details various settings and configurations available on the inverter.
Configures inverter response to grid power quality events.
Outlines procedures and requirements before starting inverter commissioning.
Step-by-step instructions for safely shutting down the inverter.
Guidance on restarting the inverter after a shutdown.
Periodic maintenance tasks required for the inverter.
Guide to identifying and resolving common fault messages and issues.
Technical specifications related to the DC input from PV panels.
Technical specifications related to the AC output to the grid.
Lists the various protection mechanisms implemented in the inverter.
Includes physical dimensions, weight, and environmental operating conditions.