AGFA DX-D 100 - Periodic Maintenance Schedule and Tasks

AGFA DX-D 100
96 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
DX-D 100 Mobile X-ray Unit
User Manual
74
0188K EN 20201116
Keep the unit connected to the mains whenever possible to maintain the
batteries at the floating maintenance level. This increases their lifetime.
Do not allow the batteries to be deeply discharged because they will lose
storage capacity and will never be able to recover the 100% of their
original capacity.
For more information, refer to “Battery Charge Level Indicators” in
Section 3.2 and “Battery Capacity for the Generator and the
Motors” in Section 6.1.
5.1.2 PERIODIC MAINTENANCE
The first periodic maintenance service should be performed six (6) months after
installation, and the subsequent services at twelve (12) month intervals.
Periodic maintenance tasks shall include the following items:
DO NOT REMOVE ANY COVER, DISASSEMBLE OR
MANIPULATE INTERNAL COMPONENTS IN THE UNIT.
THESE ACTIONS COULD CAUSE SERIOUS PERSONAL
INJURIES AND / OR EQUIPMENT DAMAGE.
1. With the Unit OFF, plug it in and leave it sufficient time to completely
charge. The recommended time is approximately 9 hours, until the
Battery Charge Level Indicators on both columns stop scrolling and the
upper Green Indicators remain illuminated.
2. Once fully charged, unplug the Unit from the mains power. Wait a few
minutes and reconnect the Unit to the mains. The upper Green Indicators
should scroll up for approximately one minute.
If the Battery charge level Indicators begin to scroll up from any other
Indicator below, contact the Service Department.
3. Switch the equipment OFF by shutting down the computer. Remove
Switch-key and unplug from mains.
4. Check the external cable connections.
Note .