1200 Series Quarternary Pump User Manual 37
Installing the Pump
3
Installing the Quaternary Pump
2 Ensure the power switch on the front of the module is OFF (switch stands
out).
Figure 7 Front of module
3 At the rear of the module move the security lever to its maximum right
position.
4 Connect the power cable to the power connector at the rear of the module.
The security lever will prevent that the cover is opened while the power
cord is connected to the module.
5 Connect the required interface cables to the quaternary pump, see
“Connecting Modules and Control Software” on page 39.
HZg^VacjbWZg
HiVijhaVbe
EdlZghl^iX]
Hadi[dg^ciZg[VXZ
WdVgY
6E<GZbdiZ
GH"'('8
86C <E>7
8dc[^\jgVi^dchl^iX]
EdlZg
HZXjg^inaZkZg
6cVad\egZhhjgZ!
'bk$WVg