36 1200 Series Quarternary Pump User Manual
3 Installing the Pump
Installing the Quaternary Pump
Installing the Quaternary Pump
1 Place the module on the bench in a horizontal position.
Parts required # Part number Description
1Pump
1 Power cord, for other cables see text below and “Cable Overview” on page 120
Control Software (ChemStation, EZChrom, OL, etc.)
G4208A or
G1323B
and/or a handheld controller (Instant Pilot or Control Module)
Preparations • Locate bench space.
• Provide power connections.
• Unpack the pump.
Module is partially energized when switched off, as long as the power cord is
plugged in.
Repair work at the module can lead to personal injuries, e.g. shock hazard, when the
cover is opened and the module is connected to power.
➔ Make sure that it is always possible to access the power plug.
➔ Remove the power cable from the instrument before opening the cover.
➔ Do not connect the power cable to the Instrument while the covers are removed.
"Defective on arrival" problems
If there are signs of damage, please do not attempt to install the module. Inspection by
Agilent is required to evaluate if the instrument is in good condition or damaged.
➔ Notify your Agilent sales and service office about the damage.
➔ An Agilent service representative will inspect the instrument at your site and
initiate appropriate actions.