42 1200 Series Quarternary Pump User Manual
3 Installing the Pump
Flow Connections of the Quaternary Pump
2 Place the vacuum degasser and the solvent cabinet on top of the quaternary
pump.
3 Put the bottle-head assemblies into solvent reservoirs containing your
mobile phase and place the bottle in the solvent cabinet.
4 Connect the inlet tubes from the bottle-head assemblies to the inlet
connectors A to D (typically the left connection of the channel) of the
vacuum degasser. Fix the tubes in the tube clips of the vacuum degasser.
5 Connect the solvent tubes to the outlet connectors (typically right
connection of the channel) of the vacuum degasser.
6 Connect the syringe adapter from the degasser accessory kit to the solvent
tube of channel A.
7 Using a piece of sanding paper connect the waste tubing to the purge valve
and place it into your waste system.
8 If the pump is not part of a Agilent 1200 Series System stack or placed on
the bottom of a stack, connect the corrugated waste tube to the waste outlet
of the pump leak handling system.
9 Connect the pump outlet capillary (pump to injection device) to the outlet
of the purge valve.