Technical Information
Controller Installation
152/192 TwisTorr 74 FS AG On-board Controller User Manual / 87-901-054-01
1 Turn the pump upside-down;
2 Place the square plate bracket on the pump bottom;
3 Place the eight screws in the holes on the pump bottom;
4 Tighten the screws properly;
5 Turn the pump again;
6 Place the pump aligning the 4 holes of the square plate in the holes on the top of
the controller;
7 Place the four screws on the top of the controller;
8 Tighten the screws properly;
9 Plug the line cord and connect the pump cable to the pump;
10 Connect the mating connector with the jumper on the interlock signal to start the
pump.