9300015500 Rev. C 2 of 14 Pre-installation Instructions
Contents
Introduction ................................................................... 2
Safety ...................................................................... 2
Before the Installation ................................................... 3
User Representative ................................................ 3
Entrance .................................................................. 3
Bench Space and Load ........................................... 3
Vibration .................................................................. 6
Exhaust System ....................................................... 7
Temperature ............................................................ 7
Humidity ................................................................... 8
Particulate Matter .................................................... 8
Power Requirements .............................................. 8
Installation Site Power ............................................ 9
Qualified Computer Equipment ............................. 10
Gas Requirements ................................................ 10
Argon .................................................................... 11
Materials and Solvents ......................................... 11
When the LC/MS Arrives ............................................ 13
Inspecting the Shipping Cartons ........................... 13
Unpacking and Installing ....................................... 14
Spare Parts ................................................................ 14
Preventive Maintenance ............................................. 14
Introduction
The Pre-installation Instructions are a guide for each requirement of the checklist. Follow these
instructions to ensure that the installation requires no more than the usual three days. The
requirements in this document must be complete before scheduling an installation. Have the
completed checklist available to schedule the installation. The Varian Representative will install
your instrument, run the installation checks and tests; and once it‘s performance is accepted,
samples can be analyzed.
After meeting all of these requirements, contact the Customer Service office in your
region to schedule the installation.
The LC/MS operates reliably under carefully controlled environmental conditions. You must
provide suitable power sources, operating environment, materials, and solvents. Failures may
occur if you use or maintain the system outside of the power and operating environment ranges
and limits described in these instructions. The Varian Warranty and Service contract specifically
excludes the repair of failures due to such causes.
CAUTION
All phases of preparing the installation site must conform to
local safety, electrical, and building codes. These codes take
precedence over any recommendations in these
instructions. The customer is responsible for compliance.
Safety
Safety is the most important consideration for instrument use. Determine if the installation site
complies with all relevant safety regulations.
;
Check the checklist box: Installation site complies with all relevant safety
regulations.