9300015500 Rev. C 11 of 14 Pre-installation Instructions
Argon
Argon is required as a collision gas for MS/MS work. The argon supply uses 1/8 in. connectors.
Use a two-stage 0-100 psi pressure regulator with a stainless steel diaphragm. The purity of the
argon must be greater than 99.0%.
;
Check the checklist box: Argon (greater than 99.0%), regulator, and gas lines
are installed.
Materials and Solvents
The Varian Representative will prepare solutions to tune and evaluate the LC/MS. Please
supply the materials on Table 11 and the solvents on Table 12.
Table 11 M
aterials
Quantity (each) Material
2 50 mL clean and new volumetric flask
2 1 L clean and new bottle for mobile phase reservoirs
1 1 L or larger bottle for LC/MS waste
2 10 mL clean and new volumetric flask
2 100 mL clean and new volumetric flask
1 Pipette 100 to 1000 µL and tips
1 Pipette 20 to 200 µL and tips
1 50 mL clean and new volumetric flask (for optional APCI)
1 500 mL clean and new volumetric flask (for optional APCI)
Table 12 Solvents for vESI or APCI
Quantity (each) Solvent
2 4-liter bottle LC/MS grade or better water, new and unopened
2 4-liter bottle LC/MS grade or better, acetonitrile, new and unopened