Page 5 of 20 December 2014 Ver 4
4 OPERATOR INSTALLATION
4.1 Remove control box from mounting bracket, then remove Motor/Gearbox from bracket
4.2 Prepare header frame Pull system …………………See Page 5
Push system…………………See Page 6
NOTE
NOTE
For push units with a reveal greater than 150 mm refer
to installation sheet included in the extended arm
Packaging.
4.3 Install operator-mounting bracket on the header/frame.
4.4 Install motor/gearbox on operator mounting bracket, then install control box on bracket Go to wiring
page 7
Pull System
Framed Header and Door Preparation